Case Study: Air Liquide

High Traffic Area? We'll Find a Way

The challenge: Remove 10 floors in only 30 days in a heavy traffic area with only street load access.

Houston, TX

Headquarters

Oil & Gas

Industry

0 + employees

Company Size

0 sqft

Space Size

About Air Liquide

Air Liquide is a world leader in Gases, Technologies and Services for Industry and Health. They are committed to solutions that are safe, reliable, cost-effective and sustainable.

Coming Up with the Plan

We were brought into this project by a logistics company known as Patsy Leslie & Associates our of Houston, Texas. They were doing the move for the company and needed solutions to remove 10 floors in 30 days.

Services We Provided:

Our Approach

The building was located in what is known as the Galleria area, which has heavy traffic and only street load access. We were required to start on November 25th and complete by December 31st. The product in the facility was Knoll Reff which are very parts intensive cubicles and more time to remove. We ran two shifts each having a 10 man crew.

We were faced with scheduling conflicts with regards to elevator and dock access.

Final Result

It had been stated that the landlord did not believe it could be done and was preparing to charge Air Liquide with a large fee if they extended into January. We completed this near impossible project on time despite having the odds stacked against us, saving the company time and money.

Ready to Start Your Next Project?